Electronic railway equipment. Train communication network (TCN) - Wireless Train Backbone (WLTB) Ingestion-build-48068 Mechanical test method is useful
$136.00
Description
Mechanical test method is useful in determining the mechanical characteristics
defibrillation signals) through an IS-1 connector
Integrate physical and digital planning
NOTE 3 Guidance as to the requirements for cable terminations for single core cables are given in annex A
Electronic railway equipment. Train communication network (TCN) - Wireless Train Backbone (WLTB) Ingestion-build-48068 Mechanical test method is useful1 Scope This part of IEC 61375 describes the protocols stack of a radio based Wireless Train Backbone which is used in distributed power freight trains. This part provides information on the physical layer, the data link layer, the application layer and distributed power application. The automatic inauguration of the radio based Wireless Train Backbone is not considered in this technical report.
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.
You may also like
US$ 11.99
US$ 14.99
US$ 70.00
US$ 24.99
US$ 14.99
US$ 14.99
US$ 33.00