Structures for mine shafts - Sinking stages Ingestion-build-44680 The other two revised parts
$136.00
Description
The other two revised parts of the code of practice are:
Planning authorities
while the general issues that affect C-ITS system design and implementation and related issues of what and how data in a C-ITS assisted application service provides and is realized and is therefore developed within ISO TC 204/CEN TC 278
fibre- or particle-reinforced ceramic composites
Structures for mine shafts - Sinking stages Ingestion-build-44680 The other two revised parts1 Scope This document specifies the design loads and the design procedures for the structural design of stages and components of stages. The loads specified in this document are not applicable for the design of stage ropes or sheaves. Rope sizes are determined in accordance with other standards. This document does not cover matters of operational safety, or layout of the sinking stage. This document adopts a limit states design philosophy.
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.
You may also like
US$ 33.75
US$ 877.47
US$ 200.00
US$ 64.00